After we submit drawings how long does it take for BK work them up? What is the best way to see how our design will look. ie the great room with vaulted or catheral ceiling?
Reply by Gregg Caldwell on 1/24/2007 7:57 AM
Normally the initial floor plan takes about two weeks, then each revisions takes between one to two weeks. Final plans with engineering take on average four to six weeks. We can provide both exterior and interior renderings and have our signature design service which allows unlimited deisgn time and interior design time.
Reply by Ellen Hurd on 1/24/2007 9:28 AM
We have talked with the dealer in Vevay IN and have drawn out a basic floorplan. We are not sure if it will work. How do we go about getting your signature design service so we can decide on the interior layout of our great room?